This reflected the extensive preparations made prior to the exercise: in a more realistic situation, expect this to increase by 50% to 100%--the addtional time will be spent mainly in processing the design data from scratch. We did not wish the exercise to be snagged by mundane technical bloopers. So we had much of the data files prepared ahead of time. Next exercise will do away with much of the preparations.
The discrepancy between this and the 8.5 hours quoted in the final quote deserves an explanation. Following factors contributed:
ACAPS Exercise I Tuesday 9 Aug 94 ( = ) - 10 min. 7 8 9 10 11 12 1 2 3 1 Transaction setup |.....|.....|==...|.....|.....|.....|.....|.....| 2 Rough Quote RFQ |.....|.....|..=..|.....|.....|.....|.....|.....| 3 Rough Quote Submitted |.....|.....|...=.|.....|.....|.....|.....|.....| 4 Final Quote RFQ |.....|.....|.....|=....|.....|.....|.....|.....| 5 Final Quote Submitted |.....|.....|.....|.=...|.....|.....|.....|.....| 6 PO accepted |.....|.....|.....|....=|.....|.....|.....|.....| Business 70.0 min. 7 Input CMT data |.....|.....|.....|.....=.....|.....|.....|.....| 8 Generate programs |.....|.....|.....|.....|=....|.....|.....|.....| 9 Optimize,test WMTC pgm |.....|.....|.....|.....|.==..|.....|.....|.....| 10 Set up, Plot Layout |.....|.....|.....|.....|.....|=....|.....|.....| Engineering 50.0 min. 11 Pin formboard |.....|.....|.....|.....|.....|.=...|.....|.....| 12 Route harness |.....|.....|.....|.....|.....|...=.|.....|.....| 13 Tape,tie ID |.....|.....|.....|.....|.....|.....|===..|.....| Shop (1) 50.0 min. Wednesday 10 Aug 94 7 8 9 10 11 12 1 2 3 1 Pin harness |.....|....==========...|.....|.....|.....|.....| Shop (1) 100.0 min *2 Re-pin Formboard |.....|.....|.....|.....|.....|..=..|.....|.....| *3 Re-route harness |.....|.....|.....|.....|.....|...=.|.....|.....| *4 Tape,tie ID |.....|.....|.....|.....|.....|.....|==...|.....| 5 Print ID sleeves |.....|.....|.....|.....|.....|==...|.....|.....| 6 Pin harness/adapters |.....|.....|.....|.....|.....|...===.========..| Shop (2) 170.0 min * Rework (wrong wire) Thursday 11 Aug 94 7 8 9 10 11 12 1 2 3 1 Pin harness/adapters ========.============.=====...===.===.========..| 2 Test Adapter cables |.....|.....|.....|.....|.....|..=..|.....|.....| Shop (2) 400.0 min Friday 12 Aug 94 6 7 8 9 10 11 12 1 2 1 Pin harness ========.=====....|.....|.....|.....|.....|.....| 2 Test harness |.....|.....|.=...|.....|.....|.....|.....|.....| 3 Pot harness >8 hr.cure |.....|.....|.....|.....|.....|.....====>>>>>>>>| Shop (2) 180.0 min Summary: Business Transaction - 70 min. 1.17 hr. Engineering - 50 min. .83 *Shop ( Fab 1 ) -150 min. 2.50 Shop ( Fab 2 ) -170 min. 2.83 -400 min. 6.66 -180 min 3.00 ======= 16.99 hr.
Frank Schalk
Lockheed Missile Systems Division
schalk@sparki.msd.lmsc.lockheed.com
Lane Wimberley
Lockheed AI Center
wimber@aic.lockheed.com