The Plan Manager
-
Scheduling for hierarchic Plans
-
Schedule on multiple levels of detail
-
Schedule with incomplete information
-
Scheduling based on created and required products
-
Checking Plan consistency
-
Check timing-consistency throughout the plan-hierarchy
-
Compare product-flow and resource-consumption between different
levels of abstraction
-
Tracing the execution
-
Check the execution-time against the schedule
-
Compare resource-consumptiond and product-flow against the
plan