Design Meeting - Jul 28, 1994
Design Meeting - Jul 28, 1994
Attendees
Mark Cutkosky
Larry Pfeffer
JC Reddy
George Toye
Joe Wagner
What happened?
- Larry has finished successfully the following:
- reading the PSD signals into the computer (via A/D board)
- pre-amp, modulator, and demodulator circuits
- Motor and optical system set-up complete
- Encoder board has arrived - to be integrated with the rest soon.
- Two laser LEDs have arrived. A case has to be built (like a
pen-torch).
- Final encoders, encoder boards, motors, rate gyros, power
supplies, and amplifiers are yet to be got.
- Two
PS-9XS microvideo cameras and two
ML-12MM microlenses arrived. They were tested - work well.
- George has assigned a person (name?) to draw up the circuit
diagrams and other controls-related drawings for documentation.
JC